Today the engineers arrived from Bangkok and installed the first batch of our new solar system at Discovery Garden Pattaya. Inverters, powerful batteries were installed and connected and an elevator brought in: Tomorrow the elevator will carry the 36 heave panels on the roof, they will be properly installed and connected and then we should be energy independent to a high degree.